Energy Complex has been awarded the highest level of Platinum Green Building Certification from LEED (Leadership of Energy and Environmental Design) for energy conservation, harmonious coexistence of industry and the environment and optimal utilization of resources.
A 4 year field test of the Vulcan electronic descaler was conducted at a Mall’s cooling towers in Indonesia. During the 4 years no system maintenance was required and the system was not treated with chemicals. Mall administration and maintenance report the prevention of rust in their iron pipes has been an added benefit.
Vulcan Electronic mineral descalers solve scaling problems in the cooling towers of a molding factory.
Before Vulcan S100 was installed in hotel’s main hot water line, the storage tanks had a solid 3 cm thick scale layer inside them and the pumping pressure from the booster set was at maximum while being unable to deliver adequate water pressure to the end of the line hotel rooms.
The condenser and the oil cooling system have problems such as scaling and biological slime. It needs to be cleaned once every 3 months. The normal scale inhibitor dosage is about 200 kg per month. Besides, algaecide needs to be added every year from April to October. The Vulcan descaler save this company 4,733 USD every year!
Page 4 of 5