CCI Vietnam, a global electrical components manufacturer, installed 12 Vulcan units across their factory. Results: eliminated scale inhibitor chemicals, extended chiller cleaning from 3 to 8+ months.
Cargill's chicken processing plant in Nicaragua tested Vulcan S25 and S100 on their refrigeration system. After 3 months, witness pipes remained scale-free and old limescale began to break away—even with existing water softening and chemical treatment.
The Energy Complex in Thailand, the first office complex in Southeast Asia to receive LEED Platinum certification, installed Vulcan S250 and X-PRO 1 units on their condenser water system. Within 4 months, they eliminated 330 lbs of monthly scale buildup, reduced chiller approach temperatures, and improved overall energy performance.