The Ugii Nuur Sum municipality in Mongolia installed 2 Vulcan S150 units on heating boiler supply and return pipes. Results: reduced scale, enhanced heat exchange efficiency, quantifiable decrease in fuel consumption.
Pepsico's Walkers Snacks plant in the UK installed 4 Vulcan S100 units across their reclamation site. Results: cleaning time reduced from 40 to 10 hours per month, reduced maintenance, lower energy consumption and carbon emissions.
A leading pharmaceutical factory in Vietnam installed Vulcan X-Pro 1 on their 2000RT chiller and cooling tower system. Results after two years: cleaning frequency reduced from every 2-3 weeks to every 6 months, 100% chemical savings, and reduced electricity usage.
The historic Furama Hotel Dalian, a 30-storey, 620-room luxury hotel in northeast China, installed a Vulcan S25 on the hot water heat exchanger inlet. After 10 months, hard scale was removed from heat exchanger fins, shower heads stayed clean, and rusty water issues on floors 12-25 were eliminated—saving energy and maintenance costs.
The condenser and the oil cooling system have problems such as scaling and biological slime. It needs to be cleaned once every 3 months. The normal scale inhibitor dosage is about 200 kg per month. Besides, algaecide needs to be added every year from April to October. The Vulcan descaler save this company 4,733 USD every year!
Page 1 of 5