CCI Vietnam, a global electrical components manufacturer, installed 12 Vulcan units across their factory. Results: eliminated scale inhibitor chemicals, extended chiller cleaning from 3 to 8+ months.
The Sheraton Saigon Grand Opera Hotel in Ho Chi Minh City installed two Vulcan X-Pro 1 units—one on the DN500 cooling tower line and one on the DN500 chiller line. After a year of proven performance, they added the second unit.
A leading pharmaceutical factory in Vietnam installed Vulcan X-Pro 1 on their 2000RT chiller and cooling tower system. Results after two years: cleaning frequency reduced from every 2-3 weeks to every 6 months, 100% chemical savings, and reduced electricity usage.