The Four Season Village condominium complex in Ulaanbaatar installed 2 Vulcan S10 units on domestic hot water and 1 S25 on central cold water. After 3 months, rust and scale were flushed out, water feels softer, and rust layers have thinned.
The Ugii Nuur Sum municipality in Mongolia installed 2 Vulcan S150 units on heating boiler supply and return pipes. Results: reduced scale, enhanced heat exchange efficiency, quantifiable decrease in fuel consumption.
The Mongolian University of Science and Technology (MUST) installed Vulcan 3000 and 5000 on plate heat exchangers. Results: 100% quality coefficient, confirming optimal capacity selection.
The Neocity Residence complex in Ulaanbaatar, Mongolia installed 9 Vulcan units across multiple buildings, protecting district heating lines, cold water mains, and the Shine Mongol-3 school. A comprehensive solution for a modern development.
The historic Furama Hotel Dalian, a 30-storey, 620-room luxury hotel in northeast China, installed a Vulcan S25 on the hot water heat exchanger inlet. After 10 months, hard scale was removed from heat exchanger fins, shower heads stayed clean, and rusty water issues on floors 12-25 were eliminated—saving energy and maintenance costs.
There are 4 heat exchanger systems in the building, which have to be treated. For the business purpose, the hot water supply can not be interrupted. 4 sets of Vulcan S10 were installed to gently clean the heat exchangers and the whole piping system without stopping the machines.
Page 1 of 6