CCI Vietnam, a global electrical components manufacturer, installed 12 Vulcan units across their factory. Results: eliminated scale inhibitor chemicals, extended chiller cleaning from 3 to 8+ months.
The Sheraton Saigon Grand Opera Hotel in Ho Chi Minh City installed two Vulcan X-Pro 1 units—one on the DN500 cooling tower line and one on the DN500 chiller line. After a year of proven performance, they added the second unit.
A leading pharmaceutical factory in Vietnam installed Vulcan X-Pro 1 on their 2000RT chiller and cooling tower system. Results after two years: cleaning frequency reduced from every 2-3 weeks to every 6 months, 100% chemical savings, and reduced electricity usage.
Texhong Textile Group is one of the largest core cotton textile suppliers in the world and is primarily involved with in the production and distribution of quality yarn, grey fabrics and garment fabrics. To solve the mineral scaling problem in their cooling water system they installed the Vulcan mineral descaler on the main water pipe for the air conditioning cooling water.