The Voltige Phase 3 Aria Tower in Montreal, Canada installed a Vulcan S50 on the main cold water line to protect all 182 condominiums. Results: circulation pumps and shower heads unblocked, no longer affected by limescale. This is the third building in the project to use Vulcan.
Every 6 months the engineering staff had to manually remove scale from pumps, valves, kitchen equipment and from the 102 individual electric hot water heaters. After installing the Vulcan descalers scale was easily flushed out. After a second inspection the units were found to be almost entirely free of scale.
The Starcastle Xiangshan Nursing Home in Beijing, sourcing water from underground wells, faced severe scaling that required frequent acid cleaning of heat exchangers and caused pump failures. After installing a Vulcan S25 on the main heat pump pipe, 9 months of operation showed eliminated scaling, no pump burnout, and dramatically reduced maintenance costs—without chemicals.
Page 1 of 2