Before the Vulcan ant-scale solution was installed the factory pipelines were often blocked. This in increased the pressure in the pipe and even made the pipe explode. In the past, the company used salt-based softener to solve the scaling problems, but the result was not satisfactory. 3 Months after installing the Vulcan solution the factory pipes and equipments are still running well without getting blocked.
Every month the heat exchanger efficiencies dropped dramatically because of an increase in pressure between inlet and outlet of the heat exchanger. Vulcan S250 models were installed and after 5 months there have not been any mineral scale pressure issues in the cooling towers or heat exchangers.