4 separate units were installs and each provided a strong benefit in a production factory to reduce mineral scaling, improve heat distribution and energy transfer, eliminate water softener tank treatments and help equipment operate better.
The entire piping system and equipment have a lot of scale. After Vulcan was installed for two months, by observing the faucet, we found the scale was reduced in the pipe and equipment and the water feels softer. The Hospital provides public health and basic medical services for more than 40,000 people. It is also responsible for emergency tasks of 200,000 people in eastern Jinzhou.
Due to the shower head scaling problem in Changping student dormitory in Beijing University of Chemical Technology, the water was getting reduced after a month, and the shower head was blocked completely after 2-3 months. We installed 2 Vulcan to test. After 2 months, no scale was found on the shower heads, only saw a thin layer of white membrane, and it was easy to remove.
Page 6 of 9