
The factory was faced with significent mineral scaling problems with hard water in their chiller, grinder and water supply lines. They planned to spend nearly $400,000 to build and buy chemical systems to solve their descaling problems. Instead of using chemcials to solve their scaling problem, they opted to install the Vulcan Anti-Sacle Solution. The solution cost less than one-tenth of a traditional water softening and chemical solution at only $30,000.
Purpose:
- clean scale deposits
- prevent new scale
- reduce maintenance costs
- replace chemical dosing and softener systems
Model: Vulcan V5000, S100, S250
Installation Area:
- main water supply for the cooling tower
- cooling tower for the big grinder
- cooling tower for the small grinder
Before Vulcan Installation

- scale deposits in oil heat exchanger
- oil tempurature >122°F (very high)
- to clean every month
- heat exchanger has corrosion
- scale deposits clog the pipe
After Vulcan Installation

- oil heat exchanger is clean
- temperature is stable at 37°C – 40°C
- no need to stop machines to clean anymore
- save 7% energy consumption at grinders