Before Vulcan S100 was installed in hotel’s main hot water line, the storage tanks had a solid 3 cm thick scale layer inside them and the pumping pressure from the booster set was at maximum while being unable to deliver adequate water pressure to the end of the line hotel rooms.
Traditionally a high amount of water is required for the extraction process to produce gelatin. For this we have our own deep wells from which the required water is drawn. Due to the area‘s geology, the ground water is relatively hard which inevitably results in thick layers of adherent limestone in the tanks. Some of which only were removable by using chemical substances. To remedy this, we have already taken one of your Vulcan systems into operation in the central hot water supply. We were stunned by it‘s results!
The Hotel Isla Mallorca & Spa in Palma de Mallorca installed a comprehensive Vulcan system in June 2022. With 3 S100 units on hot water and main cold water lines, and 2 S10 units on the water deposit and irrigation lines, this 163-room hotel ensures complete scale protection across all guest and operational areas.
Page 4 of 5