To alleviate the overflow of drainage out of the basket due to oil balls in the grease trap under the sink of the counter in the cookery on the fifth floor of the building. Also, to save the administrative and maintenance expenses by reducing the periodical cleanings used to be conducted several times a year.
Every 6 months the engineering staff had to manually remove scale from pumps, valves, kitchen equipment and from the 102 individual electric hot water heaters. After installing the Vulcan descalers scale was easily flushed out. After a second inspection the units were found to be almost entirely free of scale.
The Aura Hotel in Hungary faced severe scale issues just months after opening—faucets failed within 6 months, ice machines required monthly maintenance, and bathroom cleaning took hours. After installing a Vulcan S50 on the main water line, scale turns to powder, glassware sparkles, and the Head Chef can finally focus on creating memorable meals.
The China Academy of Railway Science (CARS), founded in 1950, installed a Vulcan 5000 on the domestic hot water supply of their staff cafeteria to solve scaling of water heaters, faucets and shower heads.
Page 4 of 5