The cement production process generates excessive mineral scale accumulation in the cooling water pipes. This causes pipes to become blocked impacting production.
Yongxing Chemical Industry
6 months after installing the Vulcan descaler they still did not need to descale and clean their heat plate exchangers.
Sea Link Die Casting (Kunshan)
The cooling tower system required manual cleaning 4-6 times a year. 6 months after installing the Vulcan S100 no new scale had formed in the cooling system
Jiangsu Noon Crop Science
The cooling tower had not been cleaned before the Vulcan anti-scale system was installed. After 6 months the old scale had disappeared and no new scale was formed.
Huadu Residential Building
Several mineral descalers were installed to improve heating and energy efficiency across 1,380 household apartments late heat exchangers of all new heating systems and improves heat transfer efficiency.
Xingda Chemical Fiber
Vulcan S250 was installed on the chiller in the generator room, to ensure the long-term operation efficiency of the chiller and to avoid scale deposits.
Shengtong Valve Manufacturer
Using groundwater causes serious mineral scaling problems. Before the Vulcan descaler was installed workers had to clean with acids every 3 months. After 6 using the Vulcan descaler workers have not have to clean the same systems.
Hongfeng Hotel
The mineral descaled by Vulcan is used to extend cleaning intervals of the hotel’s evaporator equipment
Marwa Mineral Water: Tunisian Bottling Plant Protects Production with Vulcan 5000 & S10
Marwa mineral water plant in Tunisia installed Vulcan 5000 and S10 to protect their bottling facility and ensure water quality for local market production.
Hotel Orient Palace: Tunisian Beach Resort Protects AC & Sanitary Systems with Vulcan 5000 & S25
Hotel Orient Palace in Tunisia installed Vulcan 5000 on closed AC circuit and S25 on sanitary circuit to protect this beachfront resort's critical systems.